Bid follow-up software for general contractors

A general contractor's bid is rarely decided in a week. Owners are lining up financing, waiting on architectural drawings, or sitting on three competing bids while the project timeline quietly slides right.

Why these quotes go quiet

  • Financing or a construction loan needs to close before the owner can commit to a bid.
  • Permit and plan review timelines are outside anyone's control and stall the start date.
  • Owners collect competing bids from multiple GCs and take their time comparing scope and price.
  • Design isn't finalized yet, so the bid sits until drawings are locked.

A sensible follow-up rhythm

  1. Day 3Confirm the bid was received and offer to clarify scope or exclusions.
  2. Day 10Check on financing or permit status.
  3. Day 21Ask if the design has changed since the bid was priced.
  4. Day 35Close out and note that pricing may need revisiting if too much time passes.

You can change the wording and the timing, and follow-up stops the moment anyone replies.

Typical jobs people track

  • Home additions and second stories
  • New construction
  • Commercial tenant build-outs
  • Full-scope renovation projects

Worth knowing

A GC bid going quiet for a month often just means the financing or permit hasn't cleared yet — not that you lost it.

Start with the last two months of estimates

Add the ones that never got a yes or a no. That is usually enough to see whether this works for you.